Construction Cost Calculator

An indicative construction estimate from plot size, floors and finish tier

Enter details

sq ft= 111.1 sq yd
500 sq ft10,000 sq ft

Finish tier

Specification sheet shared with your estimate. Rates reviewed 2026-09-24.

Number of floors

Share of the plot the ground floor covers, 30-100%. Default 70%.

Optional. If your sanctioned plan gives a total built-up area, enter it; it replaces coverage × floors.

Indicative construction estimate

₹33,60,000 - ₹40,60,000

GST extra. Range from the Standard tier, ₹2,400 - 2,900/sq ft.

Finish tier

Standard

Rates reviewed

2026-09-24

Area details

Plot area

1,000 sq ft

111.1 sq yd

Ground coverage (assumed)

70%

of plot per floor

Built-up area per floor

700 sq ft

77.8 sq yd

Total constructed area

1,400 sq ft

700 × 2 floors

Not permission to build

Coverage limits depend on the authority, zone and plot size. Confirm with your architect or the local authority; this estimate is not permission to build.

Indicative category breakdown

Indicative allocation for illustration; your quotation itemises the actual split.

Structure (40%)₹13,44,000 - ₹16,24,000
Electrical (12%)₹4,03,200 - ₹4,87,200
Plumbing (8%)₹2,68,800 - ₹3,24,800
Finishing (25%)₹8,40,000 - ₹10,15,000
Miscellaneous (15%)₹5,04,000 - ₹6,09,000

Get a detailed quotation

Optional. Leave your name and number and we will follow up on this estimate.

Choose your country code, then enter the mobile number without 0 or the code.

Construction rate card (per sq ft)

Specification sheet shared with your estimate. Rates reviewed 2026-09-24. GST extra.

TierRate per sq ft
Basic₹2,000 - 2,400
Standard₹2,400 - 2,900
Premium₹2,900 - 3,500
Luxury₹3,500 - 4,500

Assumptions behind this estimate

  • Ground coverage assumed at 70% of the plot per floor, as set above.
  • Rates are per sq ft of built-up area for turnkey (with material) construction; the range is the published min and max for the tier. Rates reviewed 2026-09-24.
  • GST extra.
  • Category breakdown: Indicative allocation for illustration; your quotation itemises the actual split.

Not included in the rate

  • Interiors beyond the quotation (wardrobes, modular kitchen unless quoted, furniture)
  • Boundary wall and gate, unless quoted
  • Government approval fees and water/electricity connection charges
  • Plot levelling, demolition of existing structures and soil testing
  • GST